Jixi Base Jixilugu DC Hybrid Project (Unit 1)
Plant |
Jixi Base Jixilugu DC Hybrid Project (Unit 1) |
Location |
Tongyu County, Baicheng City, Jilin Province, China |
Owner(s) |
Jilin Electric Power Co., Ltd and Power China Renewable Energy Co., Ltd |
Capacity (MW) |
100 |
Construction End Date |
Under Construction |
Solar Field Area (m²) |
591600 |
Receiver Midpoint Height (m) |
210 |
Number of Heliostats |
19720 |
General Plant Data
· Location: Tongyu County, Baicheng City, Jilin Province, China
· Owner(s): Jilin Electric Power Co., Ltd and Power China Renewable Energy Co., Ltd
· Capacity (MW): 100
Plant Timeline
· Construction End Date: Under Construction
Plant Costs
Heliostat Design
· Solar Field Area (m²): 591600
Tower/Receiver
· Receiver Midpoint Height (m): 210
Plant Layout
· Number of Heliostats: 19720
Sources:
[1] http://www.cosinsolar.com/en/cases/detail/id/9.html